We received, inspected, and transported all equipment imported from China for the construction of the first solar plant in Ica, Peru.
We brought solar energy to Villacurí. We coordinated the transport of 62 containers with solar equipment, working with global suppliers and the construction company. We handled customs logistics, documentation, and transportation, ensuring every panel, inverter, and structure arrived on time to power this major energy development.
Origin:
Callao, Perú
Destination:
Villacuri, Ica
Project duration:
4 months
Sector:
Energy
Services:
Customs Brokerage
Transportation
Telescopic Crane Rental
Forklift Rental
Stevedoring Staff Support

Project Development

The Challenge

Carry out the national transportation of imported equipment from its reception to Ica, without damage and within the established deadlines, ensuring the continuity of the construction of Peru’s first solar project.
The Challenge

The Strategy

Respect the initial cost projection made with the client, holding biweekly meetings to adjust the plan according to operational alerts. Precision with flexibility.
The Strategy

Project Design

Diseño
Meetings were held with project areas, plant representatives, suppliers, and strategic partners, which allowed us to develop a comprehensive proposal, including the technical and customs strategy.
A clear operational flow was designed and documented, allowing us to anticipate scenarios and define responsibilities from origin to final destination.
The Design
The planning was structured based on technical sessions with all involved parties, prioritizing operational clarity and anticipating critical scenarios.
Logistics routes, response times, and key control points were defined to ensure full preparation before the start of each movement.
The Strategy
The operation was carried out with maximum coordination and attention to detail. Dispatches were made from 2:00 a.m., including shifts in demanding conditions, such as crossing desert areas towards Ica, ensuring punctual and incident-free transportation, including various components such as solar panels.
Fieldwork was coordinated daily with the site manager, adjusting deliveries according to the construction progress and the operational priorities of the project.
Ingeniero revisando planificación en obra

The stages

1. Logistics planning

2. Customs management and meetings

3. Scheduling units for container pick-up

4. Management of returns without detention surcharge

1. Logistics planning

2. Customs management and meetings

3. Scheduling units for container pick-up

4. Management of returns without detention surcharge

The Challenges

Each component coming from China had to meet the country’s entry requirements.
A thorough review of all items was carried out, ensuring that the documentation and technical specifications were in order before their nationalization.
Detailed verification of imported supplies
The key was to maintain smooth communication between the construction company, the client, and our team.
It was necessary to align timelines, priorities, and operational windows so that each stage progressed without interference.
Coordination between multiple fronts
Site access had soft soils, which required quick solutions to prevent units from getting stuck.
Internal routes were reinforced with planks, ensuring stability and continuity in unloading operations.
Ingeniero revisando planificación en obra
During the execution, critical unplanned requirements were added: the client requested special maneuvers to unload transformation centers.
We responded immediately, managing 70-ton telescopic cranes and forklifts, precisely meeting the delivery times on site.
Orders beyond the initial scope

KPIs

100%

Green channel

100%

Project time compliance

0%

Incidents

Project photos

Project Review

Sharf management helped us overcome many obstacles that appeared along the way, avoiding delays and associated logistical costs.

Alvaro Gomí

Logistics Manager at CVC Energía

Let’s talk

Fill out our form and an expert will contact you.

High-impact logistics projects

Barranquilla Project

Barranquilla Project

Learn more ›
Villacurí Project

Villacurí Project

Learn more ›
Puerto Salvador Project

Brasil Project

Learn more ›
La Joya Project

La Joya Project

Learn more ›